Summary of the FL3DMS Presentation at the CFIHOS Face-to-Face Meeting 2026

Standardised information improves engineering, procurement and construction efficiency, while producing the key data required for commissioning and operations as a by-product. A proof of concept, demonstrated at the CFIHOS F2F meeting, shows how data standardisation can deliver measurable value for owner operators, engineering contractors, and software vendors alike. 

Development of key engineering deliverables enabled by set of aligned data standards 

After several years of collaboration between industry experts and standards communities, the alignment of four key engineering standards is reaching an important stage. At the CFIHOS PAU26 conference, held from 26–29 October 2026, a joint demonstration showed how FL3DMS, DEXPI, CFIHOS and CII Advanced Work Packaging (AWP) can work together to improve the flow of engineering information across project phases.  

The significance lies in the alignment of these standards, which govern four key engineering deliverables of a capital project. Each standard addresses a specific part of the engineering lifecycle. Their combined use enable the output from one step to be used as input to the next without the need to recreate, reconcile and manually transfer information between disciplines, systems and project phases. 

Four standards, one connected engineering process 

The demonstration brought together four complementary and aligned standards: 

  • Front End Engineering: Data Exchange in the Process Industry (DEXPI) supports the creation and exchange of structured 2D Process and Instrumentation Diagrams (P&IDs), including tags, piping, properties and plant topology. 
  • Detailed Design: Facility Lifecycle 3D Model Standard (FL3DMS) defines requirements for the content, configuration, delivery and lifecycle management of 3D models based on the P&IDs. 
  • Construction: Advanced Work Packaging (AWP) supports construction planning (4D) and execution (5D) based on the project schduel and work packages defined in the 3D Model. 
  • Commissionong and Handover: The Capital Facilities Information Handover Specification (CFIHOS) defines requirements and structure for engineering and asset information exchange, integration and handover. 

The alignment allows information created by each engineering discipline to be reused in subsequent project phases.  It also allows generation of handover information in the right format at source.  

The alignment is enabled via common data structures and terminology in all the standards. For example, FL3DMS uses DEXPI and CFIHOS classes in its 3D Model Content Requirements Matrix, incorporates CFIHOS and CII AWP entities and properties in its Data Model and Dictionary, and uses CFIHOS discipline and document types in its Deliverables List. 

Demonstrating interoperability in practice 

To demonstrate the potential of this alignment, the contributing teams developed a small engineering project using data from a DEXPI-based P&ID to develop an FL3DMS-compliant 3D model, which in turn was used to define work packages and a 4D path of construction.  The data generated was also used to populate several handover deliverables. 

Key engineering The demonstration showed how consistent engineering information could support: 

  • Automated consistency checks between P&ID and 3D model information, verifying consistent topology but identifying an additional valve and inconsistent piping specifications. 
  • Automated generation of engineering deliverables, including 11 fabrication isometrics. 
  • Definition of construction work packages and a 4D construction plan using 3D model data. 
  • Generation of 14 CFIHOS-compliant handover…

USPI Annual / MB Meeting – Thursday 23 April 2026

Dear USPI Member and interested expert , 

Please reserve Thursday 23 April 2026 in your agenda for the USPI Management Board Meeting and the Annual Meeting hosted at the McDermott offices in The Hague, The Netherlands.

Key Speaker highlight| Frank van Ewijk 

We are pleased to announce that Frank van Ewijk, Director Programmes at IOGP, will be delivering a keynote industry presentation 

during the Annual Meeting. His session will provide insights into: 

• Key focus areas for Owner Operators 

• Major IOGP programmes including JIP33 

• The role of standardisation and data in enabling these programmes 

Purpose of the meeting 

During the meeting we will: 

• Present the USPI results from 2025 and the Business Plan for 2026 

• Share updates on current USPI projects and ISO activities 

• Learn from peers about their journey with implementing data-interoperability standards 

• Engage in valuable networking with industry colleagues 

Agenda Highlights 

• 13:30 Management Board Meeting (only for USPI members) 

• 14:00 Annual Meeting (Open): 

• FL3DMS Face-to-Face read-out 

• Project presentations (Tagging and Coding, IM-LCF) 

• Update ISO activities 

• Data Standards Quiz 

• Key industry presentation by Frank van Ewijk 

• Summary, actions, and closure 

• 16:30 Drinks and networking 

Logistics 

The venue is easily reachable by public transport. 

Click here to see more information about the logistics. 

Address 

Haagse Poort Prinses Beatrixlaan 35 2595 AK, The Hague,NL Tel +3170 373 2010 


Join us! 

If you wish to participate, please register here

Please note that, for access to the McDermott office building, all participants are kindly requested to bring a valid form of identification (passport or national ID card). Identification must be presented at reception upon arrival. 


We look forward to welcoming you in The Hague and collaborating with you on another impactful year for our industry. 
Kind regards, USPI Executive Committee 

Stichting USPI-NL

3817CH , Amersfoort The Netherlands 

E-mail:stichting@uspi.nl

FL3DMS & USPI Annual MB FTF Meeting (21–23 April 2026)

Great to look back on an inspiring and productive week in The Hague!
A big thank you to everyone who joined the FL3DMS Face-to-Face Meeting (21–23 April 2026) and the USPI Annual & Management Board Meeting (23 April 2026).
Over the past days, we had the opportunity to:
✔️ Share insights and progress on FL3DMS and related initiatives
✔️ Align on strategy and future roadmap
✔️ Exchange knowledge across the industry
✔️ Strengthen collaboration within the USPI network

A special thank you to McDermott International, Ltd for hosting us and providing such a great venue for collaboration and discussion.
The sessions, discussions, and energy in the room truly highlighted the importance of working together on standards, interoperability, and data-driven transformation across our industry.

Many thanks as well to all speakers, contributors, and organizers for making this such a valuable and engaging event — and to all participants for your active involvement and openness.

Looking forward to continuing this momentum and seeing you at the next sessions!
hashtag#FL3DMS hashtag#USPI hashtag#DigitalTransformation hashtag#Engineering hashtag#Data hashtag#Collaboration hashtag#Standards hashtag#TheHague hashtag#McDermott

Hans Teijgeler Receives Royal Decoration for Pioneering Work in Engineering Information Standardization

On December 11, 2025, Hans Teijgeler was honored with a Royal Decoration Ridder in de orde van Oranje-Nassau during a ceremony at the Council Chamber of Bergen (NH), The Netherlands. This recognition celebrates his outstanding contributions to standardization of engineering information and data within the process industry supply chain, a field in which he has been a driving force for more than three decades. 

Through his work at the Engineering Contractor Fluor which is a member of the association USPI, and his participation in projects under ISO TC 184/SC 4 (Industrial data), Hans played a pivotal role in developing ISO 15926, an internationally recognized standard series that enables Integration and exchange of information and data across the process industry supply chain—independent of specific software systems. His efforts have significantly improved the quality and consistency of engineering information in the process industries, and addresses growing demands for safety, environmental compliance, efficiency, and speed to market. 

Despite limited resources and a shrinking pool of engineering experts over the past decades, Hans’s commitment and expertise have resulted in a robust, theoretically sound, international standard that can be adopted in practice which we see happening in several companies. Based on learnings from this, a second edition is being developed in ISO TC 184/SC 4/WG 3.  

The decoration was presented by the mayor of Bergen with some 40 people from family, friends, and USPI colleagues, present. He explained the depth and the meaning of the Royal Decoration given. Paul van Exel, Director ISO standardization of USPI, expressed the admiration and pride of Hans, as felt within USPI and across the global process industry. Peter Paul Pruijn, a colleague from Fluor, shared the company’s perspective and his personal feelings of respect and appreciation.  

The Dutch Chancellery’s decision to award Hans Teijgeler a Royal Decoration underscores the lasting impact of his work and his dedication to advancing industry-wide collaboration and innovation.

USPI Workshop on 16 April 2024: Lessons learned from large capital projects

Please be invited to the USPI workshop on lessons learned from large capital projects which will be held online on:

16 April 2024 from 12:00-13:30 UTC (corresponding to 14:00-15:30 CEST (Amsterdam)).

The purpose of the workshop will be to share and discuss bridging the gap between IM and the business in doing large capital projects.

When doing large capital projects in practice, amongst which the Pallas project in the Netherlands, we came across several problem areas and challenges in realizing the required information management system.

It seemed worthwhile to share this with the experts and managers from the USPI community that has grown over the years.

Bridging Information Management (IM) and engineering for the successful implementation of Common Data Environments (CDEs) within projects involves navigating various problem areas and challenges. These barriers can stem from technical, organizational, and cultural factors, among others. Understanding these barriers and their origins is essential to develop strategies to overcome them.

Problem Areas and Challenges

  • Integration of Systems and Standards: The disparity in software and data standards between IM and engineering tools can hinder seamless integration, leading to data silos and interoperability issues.
  • Data Quality and Consistency: Ensuring the accuracy, completeness, and consistency of data across different systems and stages of a project is a significant challenge. This often creates tension between quality of data and progress in the project as well as budget pressure
  • Change Management: The adoption of CDEs requires changes in workflow, processes, and roles, which can be met with resistance from stakeholders accustomed to traditional methods. this is reinforced by a lack of data management skills within engineering in general
  • Security and Privacy Concerns: Safeguarding sensitive information within a CDE, while ensuring that the right stakeholders have access to the data they need, is a complex balance to achieve.
  • Training and Skill Development: The lack of familiarity and expertise with IM principles and CDE platforms among engineering professionals can limit the effectiveness of implementation.
  • Cultural and Organizational Barriers: Different organizational cultures and structures can lead to misalignments in goals and expectations, hindering collaboration.

Barriers and their Origin

  • Technical Barriers: Stem from the complexity of integrating diverse systems and ensuring data quality across them.
  • Organizational Barriers: Arise from established procedures, hierarchies, and the resistance to change within organizations.
  • Cultural Barriers: Related to the differences in work cultures, communication styles, and the willingness to collaborate across disciplinary boundaries.
  • Semantically barriers: companies have developed their own technical languages which are difficult to integrate into a common data environment without in-depth knowledge and experience with interoperability

Overcoming the Barriers

  • Standardization and Interoperability: Develop and adhere to industry standards for data and software interoperability to facilitate seamless integration.
  • Organize ISO 8000 maturity checks within involved companies to create awareness of existence of barriers.
  • Data cleansing: To integrate data into a CDE from the many legacy engineering tools, knowledge and experience is required with regard to data cleansing of any information flow towards CDE
  • Education and Training: Invest in comprehensive training programs to build competency in IM…

USPI Safari about CFIHOS – 29 June 2023

USPI Safari about CFIHOS

Learn more about: The Capital Facilities Information Hand-Over Specification (CFIHOS)

Please be invited to our USPI Safari about The Capital Facilities Information Hand-Over Specification (CFIHOS), also known as IOGP JIP36, on 29 June 2023 from 02:00 PM – 04:00 CEST.

Target Audience

This Safari is intended for:

  • Organisations that are not yet members of CFIHOS and who want to know more about the standard.
  • Staff within member-organisations that have only basic awareness of the standard and want to learn more about it. 

Presenters & Objectives

Peter Townson and Anders Thostrup will be your safari guides. Peter will provide an in-depth exploration of CFIHOS, including its background, history, implementation, and future plans. Anders will also join us to highlight the collaboration partners and their importance in advancing this specification.

Agenda:

  • Welcome – Anders
  • Introduction – Peter
  • Purpose of presentation – Peter
  • What is CFIHOS-JIP36? – Peter
  • Background and history, implementation – Peter
  • Forward plan – Peter
  • Collaboration Partners – Anders
  • Q&A 
  • Closure

Background USPI Safaris – your platform for connecting with peers

One of USPI’s goals is to provide a platform for members to exchange problems, developments and views about international standards and best practices for plant lifecycle information. Our safaris are one of our preferred mechanisms to achieve this goal, i.e. to get in contact with and involve our members and MOU partners. They are networking events, organized by USPI for members to share knowledge on information management and international standardization in the plant engineering supply chain. 

The purpose is to facilitate a member company to share in-depth knowledge on topics or developments taking place in their company with a group of experts from other member companies to encourage learning and networking across our members.

Interactive Format

This is a learning event. We therefore encourage your active participation and engagement. We will take questions and encourage dialogue throughout the session. At the end there will also Q&A session. If you have questions in advance that you would like to see answered during the session, please send them to vincent.grondman@uspi.nl and Peter Townson pt@iogp.org.

Hope seeing you on June 29th

On behalf of CFIHOS & USPI,

Peter Townson (CFIHOS Director) & Anders Thostrup (USPI Chair)

How to join:

If you are interested in joining this safari, please register via this link

Please forward this invite to colleagues and connections you may think would benefit from the Safari.

Looking forward to seeing you on 29 June 2023!

Article: “Car wash for data”: Best practices for Information and Configuration Management applied at Pallas nuclear facility

For those of you interested in how to manage the creation of a Common Date Environment (CDE) based on engineering information delivered by different companies using different engineering tools in a structured way, the article written by the USPI members Leo van Ruijven (Croonwolter&dros) and Jim Novack (Dynatec) provides a good starting point.

Although the target group for the article are people in the Nuclear industry, the content of the article provides a good basis for those looking into doing the same for any other regulated industry or industry in general.

The article is titled “Car wash for data”: Best practices for Information and Configuration Management applied at Pallas nuclear facility. It describes the Why, How and What for information from the engineering phase, the architecture of a Common Data Environment (CDE) that stores the information, and the process of making the information supplied by the different parties involved suitable for entry in the CDE in such a way that it meets the requirements of the CDE. As this information is provided in different data formats (because of the use of different tooling) and may not be modelled based on the common Integrated Information Model (IIM), the underlying data needs to be cleaned up like in a car wash to make it suitably cleaned to upload in the CDE.

Having the data in the CDE based on the IIM makes the CDE very suitable as the basis for a Digital Twin (DT) to support better operations and safety.

To download the article, please click here

USPI Safari about ISO 19008 – Summary

USPI Safari  ISO 19008- 11 October 2022

On the 11th of October USPI organized a so-called Safari on the ISO-19008 standard cost coding system used in the project control domain to classify scope, activities, costs and quantities for oil, gas and renewable energy systems across the entire facility lifecycle.

In the session Chevron, Equinor and Shell presented how they are currently using the standard across the various project control disciplines, the dataflow in capital projects, digitalization opportunities, coverage of the standard, etc.

Besides major owner operators also the Performance Forum; a joint industry project; presented on the use of ISO-19008 in supplying data-centric benchmark definitions.

One of the key objectives of the Safari was to drive interest and use of the standard. With over 50 attendees, the session was well attended, and we had an open, interesting and lively discussion.

Members of USPI can find the presentations here

Please send a mail to stichting@uspi.nl if you are a USPI member and would like to get access to the USPI-Members SharePont

USPI annual MB meeting 16 June 2022 Report

USPI MB Meeting

On 16 June 2022, USPI hosted its annual Management Board meeting. With this article we want to share the key presentations with you all so you are aware of developments among in our industry and with USPI members and network.

Advance Work Packaging:
Mark den Boer and Jerome Jemotte presented how they have implemented Advanced Work Packaging on the Red2Green project in Pernis with a focus on how to structure data requirements in support of the process. This is the third time they are implementing AWP and they have an excellent grasp of the data requirements required to support this process.

Industry tagging Philosophy:
On behalf of IOGP and USPI we proposed to create an industry tagging philosophy to enable better integration via consistent tagging across scopes of different contractors, packages, vendors etc.  The presentation was well received, and we are now calling for 10-12 participants to kick off the work.  4 parties have already been identified.

Cost and Planning data standard:
Ferry Zollner presented ISO 19008 and its use-cases. The standard is used widely in our front end and project controls systems and is being adopted by several of our competitors and one of the benchmarking organisations.  This presentation is part of our wider effort to create awareness and widen adoption.

Instrumentation data standard: 
Wilhelm Otten and Heiner Temmen of DEXPI and NAMUR presented how parts of those two standards can be implemented to standardise instrumentation data; with a longer term objective to make such data application-neutral in a similar way that DEXPI has created a neutral format for the P&ID data.

Implementation of industry data standards, including CFIHOS:
Jean Luc Hoffert of Technip and John Leeflang of McDermott presented the EPC view of the current implementation of data standards

Business plan of USPI:
Martin te Lintelo presented the USPI results of 2021, plan for 2022 and finances.  These were supported and endorsed.

Future options plan:
Peter Paul Pruijn presented the future options planning document of USPI, and organised feedback on this in an interactive session.  There was overwhelming support for the “Shrink scenario” which will now be adopted by USPI

Please do not hesitate to get in touch should you have questions about these sessions, or about joining a project of USPI.
For access rights to SharePoint please contact vincent.grondman@uspi.nl

On behalf of the USPI Executive Committee

Vincent Grondman

USPI annual MB meeting – 13 Feb 2020, Hoofddorp, NL

On Thursday 13 Februari 2020, the USPI annual MB meeting was held at the Offices of Fluor in Hoofddorp, NL.

The meeting ran from 09:00 to 18:00 hrs, and was followed by drinks until 19:00 hrs. Over 50 experts and managers from The Netherlands, Europe, Malaysia and the US participated in the meeting.

The key topics were:

  • Management changes in USPI
  • USPI project proposals for 3D and Systems Engineering
  • The CFIHOS project
  • Current interest level in process industry for IM and standardization.
  • Investing in standardization in Building & Construction and Infrastructure

A brief summary of these key topics is given below with the agreed actions

Conclusions and actions on key topics:

  • At the closed meeting the activities done in 2019 were presented and the plan for 2020-2021 was approved by the members of USPI. They also approved Martin te Lintelo as successor of Paul van Exel who will continue his responsibilities for ISO matters and managing the administration. The intent is Martin will take over these activities in a later stage. Members also approved the position of Elbert van der Bijl as member of the Executive Committee of USPI. Anders Thostrup, chairman of USPI, thanked Paul van Exel for his tremendous efforts for driving USPI through difficult times when interest in standardization was limited and for successful delivery of the CFIHOS project and other projects.
  • USPI presented two project proposals for execution by industry in 2020 – 2021. The first proposal is to develop a common specification of 3D information required as basis for key applications in design, engineering, operations and maintenance. The second proposal aims at developing a common guide for Systems Engineering in process industries. The Terms of Reference (TOR) of these projects were made available as handout. There was discussion on the statement made by Leo van Ruijven that Systems Engineering development in the process industry supply chain still is very weak and will need to be strengthened significantly to provide a solid framework for requirements management, systems design, activities, information management and standardization. The knowledge of this field still is limited. USPI intends to bridge this gap with the Systems Engineering project and by running conferences and workshops around this theme. Some companies have indicated their interest to participate already and an action has started to gain wider momentum for these projects though workshops and teleconferences.
  • The CFIHOS project is being adopted widely by the industry supply chain and its software solution providers. In view of its size governance of CFIHOS is transitioned from USPI to IOGP with continued collaboration being captured in a formal agreement. The new Project Leader of IOGP presented status and plans for the coming period. The DEXPI group presented the status and plans of the DEXPI standard for P&ID exchange including a proposal for further alignment with the CFIHOS project, in particular of the RDL such that other industries will also be able to use those terms and definitions.
  • The collective feeling of participants was that the interest in investments in…

USPI Annual MB meeting – Thursday 11 Mar 2021

On 11 March, USPI held its annual Members Board Meeting. At the meeting the results of the past year and the plans for 2021 were presented.  In addition, presentations were given about the current work on ISO 15926 and its implementation on the Pallas project for the Petten nuclear facility in the Netherlands, and the new USPI project to deliver a Facilities Lifecycle 3D Model Standard for the process industries. 

Key updates:

  • A new standardisation project, the Facilities Lifecycle 3D Model Standard (FL3DMS), in which a very enthusiastic working team has progressed quickly to deliver its first draft in January 2021, based on existing 3D specifications of the participating owner operators. It is anticipated that a final first version of the standard will be available in the first half of 2021, in addition to a business case that will identify all value opportunities associated with 3D model use in projects and assets, and in digital twins.
  • ISO 15926 is progressing a number of initiatives to modernise the standard, which need to be made accessible and useful to the next generation.  A poll amongst the participants confirmed by strong majority that the ISO 15926 work is seen as fundamental for our industry, and should continue.  ISO 15926 provides a solid theoretical foundation on which most other data standardisation efforts are build.  USPI will seek to address the current shortage of funding in support of this work.  The standard needs to be made more easy to adopt to increase its use, and a change management is required in this respect, pending funding.
  • In 2020 USPI concluded an effective handover of the CFIHOS project to IOGP thanks to a strong collaboration between the two organisations.  This was embodied in a recent MOU to facilitate RDL alignment at CFIHOS-Industry-ISO level, leveraging the envelope concept. The MOU will also ensure alignment of digitalisation roadmaps and CFIHOS/FL3DMS – to enable concurrent use in projects & assets
  • USPIs Members were keen to see more small events over the year to enable knowledge share and best practice exchange, not just on technical content and new developments such as AI, but also in support of change management, to engage senior managers and articulate business cases for data.  Members also requested USPI to publish its deliverables as open source and to organise joint events with its sister organisations such as DEXPI and CFIHOS on common use across projects. A number of volunteers came forward to assist with driving the program in 2021.

Ckick here to download the presentations (login required)

USPI annual MB meeting – 17 Apr 2019, Amersfoort, NL

On Wednesday 17 April 2019, the USPI annual MB meeting was held at the Yokogawa Offices in Amersfoort, NL.

The USPI annual meeting ran from 09:00 to 18:00 hrs, followed by drinks until 19:00 hrs

 
The meeting was successful in meeting the goals: 

  • To bring together international standards consortia to present their projects on Information Management
  • To agree on the degree of orchestration that will be required
  • To present standards development in the B&C and Infra sector in NL
  • To present that USPI business plan for 2019 and rank possible projects

Conclusions from the meeting: 

  • The possible projects need work in developing the business case and see how the existing standards can be used
  • The  ISSC committee is taking the role of setting priorities for information standards  in the process industry plant engineering supply chain
  • The standards consortia present c9onfirm the need for orchestration of projects
  • The connection of ISO 15288 with ISO 15926-11 leads to a useful set of standards and will assist B&C and Infra to grow form documents to data

It was considered very useful to have presentations on BIM in the agenda, it enhances mutual involvement in standards development. 

The meeting was well attended, some 50 participants took part.

Below you will find the agenda followed