IM-LCF — Information Management in Large Capital Facilitie

Improving lifecycle information management in large capital projects

The Information Management in Large Capital Facilities project, or IM-LCF, brings companies and industry experts together to address practical information-management challenges in large capital projects.

These projects involve many organisations, disciplines, software tools and information formats. Engineering data, supplier information, documents, models and asset information must be created, exchanged, checked, integrated and maintained throughout the facility lifecycle.

Fragmentation between organisations, disciplines and lifecycle stages makes this difficult. Information may be distributed across separate systems, use inconsistent terminology or lack the quality and structure required for reliable reuse.

IM-LCF examines how organisations can use international standards, structured data and practical information-management methods to:

  • improve the quality and consistency of project information;
  • integrate information across disciplines and organisations;
  • support reliable information exchange throughout the facility lifecycle;
  • reduce dependence on proprietary data structures;
  • improve organisational readiness for data-centric working; and
  • define the capabilities required from supporting software tools.

The project is relevant to owner operators, engineering, procurement and construction contractors, engineering companies, equipment suppliers, software and IT providers, consultants, universities and information-management specialists.

Why IM-LCF matters

Large capital facility projects are fragmented in two important ways.

First, project information is distributed among clients, contractors, engineering disciplines, suppliers and software systems. Each organisation may use its own processes, terminology, data structures and tools.

Second, information changes throughout the lifecycle. Requirements, design information, operational information and the physical facility must remain consistent and traceable from concept development through engineering, construction, operation, maintenance and decommissioning.

The combination of organisational and lifecycle fragmentation creates a complex information-management environment. The original USPI Safari illustrated this challenge by connecting the facility’s required, designed and actual configurations and showing the organisational, technical and semantic barriers between them.

IM-LCF addresses these barriers through practical workshops, shared project experience and published guidance.

Project background

IM-LCF originated from the USPI Safari held on 16 April 2024 on lessons learned from information management in large capital facility projects.

The Safari and the subsequent industry survey showed strong interest in further work on data quality, international data-integration standards, Common Data Environments and the integration of engineering, information-management and IT knowledge.

USPI therefore established IM-LCF as a sequence of workshop series. Participating organisations contribute experience, use cases and practical challenges. The project team consolidates the findings and makes the lessons learned available to the wider industry.

This collaborative approach is intended to produce guidance that reflects actual project conditions rather than purely theoretical models.

Project programme

IM-LCF consists of four connected workshop series. Each series addresses a different capability required for effective lifecycle information management.

Workshop Series 1 — ISO 15926-11 and the Common Data Environment

Status: completed; report published on 1 July 2026

Workshop Series 1 examined how organisations can integrate plant lifecycle information by using ISO 15926-11 and a Common Data Environment, or CDE.

A CDE is not necessarily a single software application. It is an agreed information environment in which project and asset information is collected, managed and distributed through controlled processes. It may consist of several connected systems.

The series focused on a data-centric CDE that can bring together documents, structured engineering data and graphical models without depending on a single proprietary vendor solution.

Topics included:

  • organisational and lifecycle fragmentation;
  • CDE principles and governance;
  • ISO 15926-11 and semantic data structures;
  • project ontologies and reference data;
  • integration of discipline-specific information;
  • information maturity and organisational readiness;
  • data quality and contractual requirements;
  • implementation barriers and software limitations; and
  • lessons learned from participating organisations.

The published report does not provide a universal implementation manual. Instead, it presents practical lessons, considerations, templates and recommendations that organisations can use when defining a CDE approach appropriate to their own projects.

Publication: IM-LCF Project Report on Series 1
Publication number: I-RE1-001 IM-LCF S1
Publication date: 1 July 2026

Workshop Series 2 — Data cleansing of engineering and supplier data

Status: workshop series completed; report in preparation

Equipment suppliers and engineering disciplines often provide information in different file formats, data structures and information models. Before this information can be integrated into a CDE, it must be checked, classified, mapped, corrected and validated.

Workshop Series 2 examined practical methods for improving the quality and usability of engineering and supplier data.

Topics included:

  • data-quality requirements;
  • data cleansing and mapping;
  • missing, duplicate and inconsistent data;
  • semantic modelling;
  • project ontologies and reference data libraries;
  • classification and referential integrity;
  • transformation of source data;
  • integration into a Common Data Environment;
  • recording changes through a digital thread;
  • acceptance of the resulting dataset; and
  • the potential role of artificial intelligence in supporting classification, validation and transformation.

The series combined lessons learned from reference projects with the experience of participating organisations.

USPI is preparing a report that will present the consolidated findings from Workshop Series 2.

Workshop Series 3 — Information Maturity Assessment

Status: currently running

Workshop Series 3 examines the information-management maturity that organisations and project supply chains need to adopt data-centric working practices successfully.

Large capital projects involve organisations with different levels of management awareness, governance, modelling capability, data quality, standards knowledge, technical infrastructure and information-management experience. A Common Data Environment or data-cleansing process cannot be implemented effectively without understanding these differences.

The series helps participating organisations examine:

  • their current information-management maturity;
  • gaps that affect project information quality and interoperability;
  • realistic and high-impact improvement priorities;
  • readiness for CDE adoption and structured data exchange; and
  • the development of an actionable improvement roadmap.

The assessment considers several dimensions:

  • management awareness and alignment;
  • business processes;
  • people and organisation;
  • documents, data and standards; and
  • information and communications technology infrastructure.

The workshops review relevant maturity approaches, including ORCHID, ISO 8000, DAMA, CFIHOS and other models identified by the participants. The objective is to assess their suitability for information management in large capital facility projects and to determine whether further project work is required.

USPI will publish the findings of Workshop Series 3 in a separate project report.

Workshop Series 4 — Tooling specification

Status: planned

Workshop Series 4 will define the capabilities that software tools should provide to support standards-based information management in large capital projects.

The series will build on the lessons learned from Workshop Series 1, Series 2 and Series 3.

It will examine the software capabilities required to process engineering data and documents within an integrated project environment. The work will not focus on selecting a particular commercial product. Its purpose is to describe industry requirements in a common specification that can be understood by owner operators, contractors, suppliers and software providers.

Expected topics include:

  • processing structured engineering data and documents;
  • support for international data-integration and semantic standards;
  • project ontologies and reference data;
  • validation of data quality and consistency;
  • management of identifiers and relationships;
  • traceability of changes, additions and deprecations;
  • integration across authoring tools and information sources;
  • exchange with Common Data Environments;
  • long-term accessibility and migration of information; and
  • practical requirements from different project stakeholders.

The specification is intended to support the successful adoption of international data-integration standards and reduce the gap between information-management requirements and available software capabilities.

Project outcomes

IM-LCF develops practical knowledge through a combination of workshops, participant use cases and published reports.

The project aims to help organisations:

  • set realistic information-management ambitions;
  • understand the maturity required to achieve those ambitions;
  • define appropriate information and data-quality requirements;
  • improve collaboration between engineering, information-management and IT specialists;
  • evaluate the practical application of international standards;
  • improve the integration of engineering and supplier data;
  • identify organisational and technical implementation barriers;
  • make informed decisions about information architectures and supporting technology; and
  • learn from the experience of other organisations.

Reports are prepared after individual workshop series so that lessons learned can be shared with industry without waiting for the completion of the full programme.

Who should participate?

IM-LCF is intended for organisations involved in the creation, exchange, management or use of information in large capital facility projects.

Relevant organisations include:

  • owner operators;
  • EPC contractors;
  • engineering companies;
  • equipment suppliers;
  • software and IT providers;
  • service providers;
  • information-management consultancies;
  • universities and research institutes; and
  • standards organisations.

Relevant professional roles include:

  • information managers;
  • data-governance leads;
  • project managers;
  • engineering managers;
  • systems engineers;
  • data analysts;
  • IM and IT architects;
  • asset-information specialists; and
  • software product specialists.

Participants should be willing to contribute practical knowledge, project experience and lessons learned. This input is essential to the collaborative character of the project.

Why participate?

Participation gives organisations an opportunity to exchange knowledge with experts from different parts of the project supply chain.

Participants can:

  • compare information-management approaches;
  • learn from actual implementation cases;
  • discuss shared barriers and priorities;
  • improve their understanding of relevant standards;
  • contribute requirements and lessons learned;
  • assess organisational readiness;
  • influence practical project guidance; and
  • strengthen collaboration between business, engineering, information-management and IT functions.

The project does not promote a single technology provider or a universal implementation model. It supports informed decision-making by examining the organisational, contractual, semantic and technical conditions that affect each implementation.

Connection with USPI

IM-LCF forms part of USPI’s broader work on engineering and asset information, lifecycle information management, interoperability, international standardisation and practical industry collaboration.

USPI is an independent, non-profit industry association and collaboration platform. It brings organisations and experts together to exchange knowledge, develop practical guidance and support the implementation and development of international standards.

Through IM-LCF, USPI provides a neutral environment in which project stakeholders can discuss common challenges without promoting a specific commercial solution.

Participation and fees

Participation in IM-LCF is free of charge for USPI members.

Organisations that are not USPI members may participate through IM-LCF Project Membership. The current project-membership fee is €1,700. The same project fee applies to the participant categories listed in the membership form.

Organisations interested in participating are invited to contact the USPI office for:

  • the current workshop schedule;
  • participation conditions;
  • the registration form; and
  • information about USPI membership.

Contact: stichting@uspi.nl

Project team

The IM-LCF project is supported by:

Paul van Exel
USPI, ISO Standardisation Director

Leo van Ruijven
Principal Engineer, RuijVision

Rene Brouwer
LyondellBasell

Vincent Grondman
USPI Administration Lead